OUR RECENT REAL ESTATE REALIZATIONS CIS

  • Restoration of hotel COSMOS in Moscow (1986)
  • Studying and organizing the business plan for the construction of modular operation rooms of FEDOTOV hospitals (USSR 1988-1990)
  • Restoration of the Lomonosov University in Moscow (1990-1992)
  • Circuit boards factories in Baku (Azerbaijan – 1988-89) and in Alexandria (Ukraine, 1990-92)
  • Feasibility study of AQUAPARK in Moscow Luzhniki (Russia 1993-94)
  • Remodeling of offices and apartments in Kiev (Ukraine since 1994)
  • Feasibility study and study of privatization of PREMIER PALACE hotel in Kiev (Ukraine 1994)
  • Extraction plant and refinement for kaolin (Ukraine 1994-98)
  • Feasibility study for production plant for materials in medical sector (Ukraine 1996)
  • Pharmaceutical plant delivered turn-key according to GMP norms (BHFZ — Ukraine, 1999-2002)
  • Feasibility study of implementation of a chocolate factory (2003)
  • Extraction and distillation plant aromatic plants in Moldova (2002-03)
  • Extraction and distillation plant for aromatic plants in Odessa, Ukraine (2004-06)
  • Audit and study according to GMP norms of pharmaceutical laboratory DARNITSA.
  • Audit and study according to CGMP norms of cosmetic fabrication workshop of SK JOHNSON in Kiev (2004)
  • Audit and study according to GMP norms of the pharmaceutical laboratory STIROLBIOPHARM Donetsk (2006),
  • Audits of GMP certification with CERTIPHARM for pharmaceutical factory of BHFZ (from 2004 to 2007)
  • Preliminary and technical-economical feasibility study for a Logistic center with a storage workshop and an office building in Kiev (Ukraine since 2007)
  • Detailed feasibility study for implementation of the factories producing wooden pellets (Bulgaria, from 2008)
  • Preliminary analysis of implementation of a generative plant working on biomass for the energetic needs of a malt house and for a production of electricity (Ukraine 2008-2009)
  • Flour mill selling in Kiev region
  • Studies, Construction, Sale and Rent of « Galerie Honoré de BALZAC »: 7000 m² of shopping area, premium class apartments with underground parking, situated in Berdichev in Ukraine. (2008-2011)
  • Feasibility report and project planning for ADEME of biomass production for industrial boiler-houses in ROMNY district (2010)
  • Search for financing for the hotel complex in Crimea with unique SPA in Sebastopol. 2 buildings of 22 floors each with total surface of 28 000 m2. (2010-2011)
  • Search for partnership for a factory in Odessa producing the food for domestic animals (2010-2011)
  • Selling of industrial factory of more than 25000 m2 in Odessa region
  • Analysis of BREAM and LEED certification of a number of real estate complexes in Kiev (2011).
  • Feasibility study of plant construction for waste intake camions production in Donetsk (2011)